345 N Duncan Dr.
(S.R. 19)
Tavares, FL

 Peg's Canopy Connection
1-352-343-4972


Home Search Our Site Glossary Your Peg's Team Site Map Canopy Rentals! Maps To Peg's Canopy Links


   Jump Start to Site Map


Website Directory

1 5/8" Commercial
1 3/8" Standard
Tents with Valances
Total Enclosures
Standard Tarps
Custom Products
Specialty Tarps &  Ends
Canopy Parts
Motorhome Tents
Free-Standing Awnings
SunSetter Retractables
SunSetter Awnings
Window Awnings
EasyShade Screens
Concave Awning
Canopy Assembly
Awning Assembly
Awning Cut Sheets
Cut Sheets
 


 

Bungee Balls are required, you can never have too many!CANOPY ASSEMBLY INSTRUCTIONSBungie balls are required for canopy assembly, make sure to have a supply of spares.

  1. Install all Rafters and Purlins into Corner Fittings as in the diagram above.

  2. Stretch Tarp over Framework and attach with Bungee Cords.

  3. Lift one side and install Legs.  Lift other side and install legs.

  4. Anchor each canopy leg to ground.

 

Canopy assembly instructions

UPS Shipping Note:

bullet

(1) 9'9" Pipe is made by combining (1) 5'8" Pipe & (1) 52' Swaged (bottle-neck) pipe.

bullet

(1) 9'6" Pipe is made by combining (1) 5'8" Pipe & (1) 49" Swaged (bottle-neck) pipe.

Contact Information

Peg's Canopy Connection
345 North Duncan
(Highway 19)
Tavares, FL  32778
Click here for street map

Open:  Monday-Friday, 8:30AM to 5:00PM

Phone:  1-352-343-4972
Fax:  1-352-343-9166
EMail:  sales@pegscanopy.com

Copyright © 2008 Peg's Canopy  All rights reserved.
Hosted By: BusinessMasters.net

Website Development By: Weboholic.net
Search Engine Ranking by About Search Engine Rankings.com, questions:seo@peg'scanopy.com
If you have questions about this website, please email webmaster@pegscanopy.com
Revised: Thursday, October 09, 2008 10:41:25 AM
All third party trademarks may be the property of their registered owners.